L739-II
Operation Room
All People
Without
Nine
L739-II≥ 90000lx
~220V± 500V 50Hz± 1Hz
25W
115*115*38(Cm)
100*40*34(Cm)
CE, ISO
85393910
Operating Light
ISO13485, ISO9001
Without
Without
Operation Lamp
4000± 500k
24V
2800mm
23kg
everich
China
Main technical parameters: | |||||||||||||||||
| |||||||||||||||||
Packaging: | |||||||||||||||||
| |||||||||||||||||
Installation requirements: | |||||||||||||||||
1.The basement should support a burden of 500Kg.If the height of the ceiling is more than 3.2m,one extension rack should be added(it can be specially made by us) 2.The ground lead of the user should be connected with the groud lead terminal of the product.(The kelly line at the base) 3.Please contact with the company for any special requirements in installation. Meanwhile, we take the job for installation. |
Main technical parameters: | |||||||||||||||||
| |||||||||||||||||
Packaging: | |||||||||||||||||
| |||||||||||||||||
Installation requirements: | |||||||||||||||||
1.The basement should support a burden of 500Kg.If the height of the ceiling is more than 3.2m,one extension rack should be added(it can be specially made by us) 2.The ground lead of the user should be connected with the groud lead terminal of the product.(The kelly line at the base) 3.Please contact with the company for any special requirements in installation. Meanwhile, we take the job for installation. |